A 21-unit apartment building like the one at 1312 Jackson Street, built in 1909, is exactly the kind of asset San Francisco had in mind when it wrote the Mandatory Soft Story Retrofit Program in 2013. Wood frame. Multiple stories over a garage or open ground floor. Old enough to predate any seismic code that would have addressed the problem at construction. Buildings with this profile are common across Nob Hill's mid-size apartment stock, and for years the city's answer to "does this need a retrofit" was a compliance deadline with a specific date attached.
Those deadlines are gone now. Every tier's compliance window closed years ago. What hasn't closed is the question itself. It just moved from a city inspector's file to a buyer's due diligence checklist, and that shift changes who asks, when they ask, and what happens if the answer isn't clean.
Ordinance 66-13 became law on April 18, 2013, and went operative that June. It covers wood-frame buildings of three or more stories, or two stories over a basement or crawl space, with five or more dwelling units, built under a permit issued before January 1, 1978, with a soft or weak ground story that was never strengthened. The city sorted roughly 4,900 buildings into four compliance tiers based on size and use, with the largest and riskiest going first. By September 2021, every tier's construction deadline had come and gone.
Passed deadlines are not the same as finished work. A December 2024 report from the Department of Building Inspection put the citywide count at 4,648 of 4,941 covered buildings having completed the process, with 293 still out of compliance. A February 2025 snapshot in the city's consolidated planning materials showed a similar picture, 4,655 completed against 284 not yet done. Both are point-in-time counts, not a live tally, and the city updates its records on an ongoing basis. The number that matters for any specific Nob Hill building isn't a citywide statistic. It's whether that address has a Certificate of Final Completion on file, and the only way to know is to check.
Not every older building in Nob Hill falls under this ordinance, and treating the neighborhood as one uniform risk profile misses an important distinction. The soft-story program targets wood-frame construction. Nob Hill's skyline also includes full-service high-rises like Gramercy Towers at 1177 California Street, built from different materials and eras than the neighborhood's wood-frame walk-ups. The 71-unit Nob Hill Condominiums at 1170 Sacramento Street, a 19-story tower designed by John Carl Warnecke and T.Y. Lin and completed in 1963, is a concrete building, and concrete towers of that era carry a different seismic exposure, nonductile concrete framing, which falls outside the wood-frame ordinance entirely. The Nob Hill Condominiums building went through its own seismic evaluation and retrofit, engineered to preserve the building's arched colonnade base and vertical bay windows, with construction completed in 2020 and 2021.
The practical point for anyone pricing a Nob Hill building: knowing your structure type isn't optional homework. A 1960s concrete tower and a 1909 wood-frame walk-up face entirely separate compliance regimes, separate engineering disciplines, and separate cost structures. Generic advice about "seismic retrofit in San Francisco" tends to flatten this distinction. Owners and buyers who don't separate it end up asking the wrong specialist the wrong question.
California opened a new round of retrofit funding this year through its Earthquake Soft-Story grant program, with registration running from August 19 through September 30, 2026. The program reimburses 70 percent of eligible engineering and permit costs, up to $7,000, plus 70 percent of eligible construction costs, up to $4,260 per residential unit. Run the math on the two ends of the eligible range and the ceiling looks like this:
Here's where the program's design runs into Nob Hill's actual building stock. The state grant is limited to buildings with five to ten residential units. San Francisco's own mandatory program assigns a separate tier, Tier II, specifically to buildings with 15 or more dwelling units. A building the size of the 21-unit property on Jackson Street sits well outside the grant's eligibility window on unit count alone. So does most of the mid-size apartment stock that gives Nob Hill its rental density. The state money arriving with real urgency this month, closing registration in days rather than months, is aimed at a building size that isn't the one carrying the largest retrofit price tags in this neighborhood.
California law requires sellers to disclose known material facts that affect a property's value. An outstanding soft-story obligation, particularly one that has already generated a notice of violation, qualifies. That disclosure duty doesn't expire when the ordinance's compliance clock did. If anything, the passage of time works against a seller: a building that missed its original tier deadline by several years reads differently to a buyer's underwriting team than one that was simply midstream when the pandemic pushed timelines back.
Soft-story status has become a standard line item in San Francisco multifamily due diligence, and it touches more than the purchase agreement. Lenders factor it into approval. Buyers factor it into their hold-period capital plan. A seller who assumes the topic closed when the city stopped sending notices is often the same seller surprised when a buyer's attorney asks for the Certificate of Final Completion rather than an assurance that "the work got done years ago." The San Francisco Department of Building Inspection maintains address-level records, and the city's own map of soft-story properties is public, which means any buyer's team checking a specific Nob Hill address isn't relying on the seller's memory of the project.
A meaningful stretch of Nob Hill sits inside the Lower Nob Hill Apartment Hotel Historic District, and that designation reaches directly into retrofit planning. Exterior alterations in the district require a Certificate of Appropriateness, with review by the Planning Department and, in some cases, the Historic Preservation Commission. Plan review timelines for the neighborhood generally run 8 to 16 weeks depending on complexity, and historic status pushes toward the longer end of that range.
That timeline matters most for an owner hoping to use this month's grant window to fund a fast pre-listing fix. Registration for the state program closes September 30. Design, permitting, and construction still have to happen afterward, and any retrofit component visible from the street in the historic district adds a design-review step that a non-historic building down the hill wouldn't face. An owner weighing whether to retrofit before listing or disclose and price around it needs the historic district's calendar in that decision, not just the grant's.
If my building completed its retrofit years ago, is there anything left to disclose? Confirm a Certificate of Final Completion exists for the address, not just a memory that a contractor finished the job. Permit files without a closed-out certificate can still read as open to a buyer's team.
My building has 12 units. Does the new state grant help me? No. The program's eligibility window covers 5 to 10 units. A 12-unit building falls outside it regardless of when the retrofit happens.
Where do I check a specific Nob Hill address before pricing a sale? The San Francisco Department of Building Inspection tracks compliance status by address, and the city also publishes a public map of soft-story properties. Either resource gives a documented answer instead of a guess.
Selling a Nob Hill apartment building means knowing exactly where that building sits in this picture before a buyer's team finds out first. If you're weighing a sale and want a clear read on how retrofit status, disclosure timing, and current pricing fit together for your specific address, The Bonn Webb Team offers a complimentary, confidential property valuation to help you see the full picture before you list.